R. Buckminster Fuller

Critical Path -- R. Buckminster Fuller, Paperback

$27.00 $18.99 Sale
Shipping calculated at checkout.
17 in stock, ready to ship

R. Buckminster Fuller is regarded as one of the most important figures of the 20th century, renowned for his achievements as an inventor, designer, architect, philosopher, mathematician, and dogged individualist. Perhaps best remembered for the Geodesic Dome and the term Spaceship Earth, his work and his writings have had a profound impact on modern life and thought.

Critical Path is Fuller's master work--the summing up of a lifetime's thought and concern--as urgent and relevant as it was upon its first publication in 1981. Critical Path details how humanity found itself in its current situation--at the limits of the planet's natural resources and facing political, economic, environmental, and ethical crises.

The crowning achievement of an extraordinary career, Critical Path offers the reader the excitement of understanding the essential dilemmas of our time and how responsible citizens can rise to meet this ultimate challenge to our future.

Author: R. Buckminster Fuller
Publisher: St. Martin's Griffin
Published: 02/15/1982
Pages: 512
Binding Type: Paperback
Weight: 1.24lbs
Size: 9.38h x 5.94w x 1.11d
ISBN: 9780312174910

About the Author

R. Buckmister Fuller received 47 honorary degrees, held twenty-eight patents, was awarded the Medal of Freedom, and was the author of twenty nine books. He died in 1983.

Product Tags:

Civilization, Civilization - History, History, History - General History, Paperback, R. Buckminster Fuller, St. Martin's Griffin, World

Find your next favorite

Welcome to Book & Mortar

Explore our extensive collection of contemporary and classic books. From the latest bestsellers to hidden gems, we have something for every book lover. Dive into the world of literature with our curated selection, and let your reading adventure begin.

Contact form

Fill this out if you need to get in touch with me!